IMPACT OF NEW POWER INVESTMENTS UP TO YEAR 2020 ON THE ENERGY SYSTEM OF BOSNIA AND HERZEGOVINA

Abstract

This paper investigates current and planned investments in new power plants in Bosnia and Herzegovina and impact of these investments on the energy sector, CO2 emission and internationally committed targets for electricity from renewable sources up to year 2020. Bosnia and Herzegovina possesses strong renewable energy potential, in particular hydro and biomass. However, the majority of energy production is conducted in outdated power plants and based on fossil fuels, resulting in environment pollution. New major investments The Stanari Thermal plant (300 MW) and the investment in Block 7 (450 MW) at the Thermal Plant Tuzla are again focused on fossil fuels. The power sector is also highly dependent on the hydrology as 54% of current capacities are based on large hydro power. In order to investigate how the energy system of Bosnia and Herzegovina will be affected by these investments and hydrology, the EnergyPLAN model was used. Based on the foreseen demand for year 2020 several power plants construction and hydrology scenarios have been modelled to cover a range of possibilities that may occur. This includes export orientation of Stanari plant, impact of wet, dry and average year, delayed construction of Tuzla Block 7, constrained construction of hydro power plants, and retirement of thermal units. It can be concluded that energy system can be significantly affected by delayed investments but in order to comply with renewables targets Bosnia and Herzegovina will need to explore the power production from other renewable energy sources as well.

Dates

  • Submission Date2015-01-05
  • Revision Date2015-03-09
  • Acceptance Date2015-04-04
  • Online Date2015-04-04

DOI Reference

10.2298/TSCI150105042H

References

  1. ***Indicative plan of production development 2015-2024, Sarajevo, April 2014, available from: www.derk.ba/DocumentsPDFs/IPRP_2015-2024.pdf
  2. ***International Energy Agency, Statistics, available from www.iea.org/statistics/
  3. Energy Institute Hrvoje Požar Energy Sector Study in B&H, BHP3-EES-TEPRP-Q-04/05 WB
  4. ***Energy Community Decision available from: www.energy-community.org/portal/page/portal/ENC_HOME/NEWS/News_Details?p_new_id=6342
  5. Action Plan of Federation B&H for Use of Renewable Sources of Energy, Federalno ministarstvo energije, rudarstva i industrije, May 2014, Sluzbene novine Federacije BiH , Volume 48 pp. 86-102
  6. ***Action Plan of Republika Srpska for use of renewable energy sources, Republika Srpska, Government, Banja Luka, May 2014, available from: www.vladars.net/
  7. Strategic Plan and Program of The Energy Sector Development of Federation of B&H, Federacija Bosne i Hercegovine, Vlada, 2009, Sarajevo
  8. Strategy of Energy Sector Development of Republika Srpska up to year 2030, Republika Srpska, Vlada, Nacrt, 2011, Zagreb/Banja Luka
  9. Batas Bjelic, I., et al., A realistic EU vision of a lignite-based energy system in transition: Case study of Serbia, Thermal Science 01/2014
  10. Cerovac, T., et al., Wind energy integration into future energy systems based on conventional plants - The case study of Croatia, Applied Energy, Volume 13, (2014), pp. 643-655
  11. Batas Bjelić, I., et al., Increasing wind power penetration into the existing Serbian energy system. Energy (2013), 57(0): pp. 30-37
  12. Cosic, B., et al. A 100% renewable energy system in the year 2050: The case of Macedonia, Energy, 2012, 48 (1): pp. 80-87
  13. Ćosić, B., et al., 100% Renewable Energy Solutions for Regions: the Case of South East Europe Energija, ekologija, ekonomija (2013). 15(3-4): pp. 227-235
  14. Gvero M., Petar et al., Renewable energy sources and their potential role in mitigation of climate changes and as a sustainable development driver in Bosnia and Herzegovina, Thermal Science 2010 Volume 14, Issue 3, pp. 641-654
  15. Taseska-Gjorgievska, V., et al., Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development, Thermal Science (2012), Volume 16, Issue 3, pp. 703 - 715
  16. Connolly D., et al., A review of computer tools for analysing the integration of renewable energy into various energy systems, Applied Energy, Volume 87( 4), (2010), pp. 1059-1082,
  17. ***EnergyPLAN: Advanced energy system analysis computer model, Aalborg University, Denmark. Available from www.energyplan.eu/
  18. Connolly D., at al., The first step towards a 100% renewable energy-system for Ireland, Applied Energy, Vol. 88, No. 2, pp. 502-507, 2011.
  19. Lund, H. and Münster, E., Modelling of energy systems with a high percentage of CHP and wind power, Renewable Energy, Vol. 28, No. 14, (2003) pp. 2179-2193,.
  20. Krajačić, G., et al., Planning for a 100% independent energy system based on smart energy storage for integration of renewables and CO2 emissions reduction, Applied Thermal Engineering, Vol. 31, No. 13, (2011), pp. 2073-2083.
  21. Lund, H. and Mathiesen, B. V., Energy system analysis of 100% renewable energy systems—The case of Denmark in years 2030 and 2050, Energy, Vol. 34, No. 5 (2009), p. 524-531,
  22. Krajacic G., et al., How to achieve a 100% RES electricity supply for Portugal, Applied Energy (2011); 88(2): pp. 466-72
  23. Elliston B., et al., Simulations of scenarios with 100% renewable electricity in the Australian national electricity market, Energy Policy (2012); 45: pp. 606-13
  24. *** European Network of Transmission System Operators for Electricity (ENTSO), Production, Consumption, Exchange Package, available from www.entsoe.eu
  25. Economic Consulting Associates Ltd., Western Balkans Sustainable Energy Direct Financing Facility: Institutional Capacity Building, Project N. 18, Task 1 - Assessment of the Impact of Wind Production on System Dispatch Draft Report, for the ISO B&H and EBRD, November 2012
  26. ***Elektroprivreda B&H, Decision 02-9160/14 on free access to information, Sarajevo, 21.03.2014
  27. ***Energy 3 measurement, data provided by Elvir Zlomusica, University Dzemal Bijedic Mostar, Mostar, 11.03.2014.
  28. ***Ivex d.o.o. data provided by Antonio Erceg, Usora, 25.02.2014
  29. ***Federal Hydro Meteorological Institute Sarajevo, Decision 04-33-2-307/14, Sarajevo 06.03.2014.
  30. ***Canton Sarajevo Air Monitoring, available from: www.air-monitoring.ba/
  31. ***Republic Hydro Meteorological Institute, Ministry of Agriculture, Forestry and Water, Government of RS, data provided by Igor Kovacic, Banja Luka 05.03.2014
  32. Bold F., The Energy Community's decision to implement Chapter III of the Industrial Emissions Directive 2010/75/EU and its implications for new coal power plants in the Western Balkans, Moldova and Ukraine Briefing, Briefing on the Decision of the Energy Community Ministerial Council D/2013/06/MC-EnC adopted on 24 October 2013 April 2014